219. When a pipe for a storm water management system is established, modified or replaced, and when a pipe connected to a combined sewer system is replaced, the tests and criteria that apply to the pipe are those set out in section 11.3 of standard specification BNQ 1809-300.
871-2020O.C. 871-2020, s. 219.